GUANGZHOU DIE & MOULD MANUFACTURING CO.,LTD.
Tel:
020-84234113 84429134
Fax:
020-84429134 84430194
E-mail:
trade@gzmould.com
Add:
No1099 Baogang Avenue, 510250 Guangzhou,China
  |Index > About us > Development process
1943 Established Yicheng Machine Factory.
1956 Combined the seven enterprises: Yicheng, Youcheng, Yucheng, Xielin, Xielinji, Yaohan, Xiesheng, Hefa into Yicheng Collective Mold Factory, which takes the shoe molds and small-scaled hardware, rubber and glass hardware as the main business.
1965 Transformed into the state-owned Guangzhou Electromechanical Mold Factory, taking the molds of home appliances and industrial molds as the main business. And it was in that year that it manufactured the first die-casting mold.
1985 Combined with Dongfeng Foundry to form Guangzhou Xiangqiang Mold Factory.
1985 Conducted the “Six-five”technical transformatio and invested 8.125 million RMB to import AGIE cremation machine form Italy, three-coordinate measuring machine from Britain and a batch of advanced mold equipment including Makino CNC milling machines from Japan.
1988 Conducted “Seven-five”technical transformation and invested 3.45 millions RMB to import a batch of processing equipment.
1994 Conducted “Eight-five”technical transformation and invested 6.71 million RMB to import the foreign computer hardware and software to carry out the second-time development, and undertook the key technological development program: The Research and Development of Heavy-duty and Complex Die-casting Molds of the national key enterprises in“Eight-five?period, and realized the mold manufacturing integration of CAD and CAM.
1994 Imported one VFS high-pressure vacuum heat-quenching treatment machine from America.
1996 Manufactured the first set of die-casting molds of clutch shells and transmission cases of Xiali cars domestically.
1998 Conducted “Nine-five”technical transformation and invested130 million US $- equal to12 .35 million RMB to import CNC processing center, Sanfeng three-coordinate measuring machines from Japan, ONA slow-step wire-cutting machine, a batch of high-precision electric processing lathes, computer workstations and network systems from Spain.
1999 Manufactured the first set of die-casting molds of clutch shells and transmission cases of Fukang cars domestically.
1999 Manufactured the first set of ladder-level die-casting molds of automatic escalators with three specifications domestically.
2000 Manufactured the die-casting molds of the gear-box case of Saiou car in Shanghai, with the mold weighing 28 tons.
2004 Transformed into Guangzhou City Xingqiang Mold Manufacturing Co., Ltd
2004 Invested 10 million RMB to purchase three high-speed processing centers, two CNC milling machines, one n-depth hole-drilling machine, heavy-duty mold-combination machine with 400T and vacuum tempering furnace, etc.
2004 Manufactured the first set of ladder-level die-casting molds of automatic escalators with nine specifications domestically.
2005 Manufactured the die-casting molds of Kangmingshi flywheel, weighing 31 tons?500T die-casting machine.
Add:No. 1099, Baogang Avenue, Guangzhou City E-mail:trade@gzmould.com
Tel:020-84234113 84429134 Fax:020-84429134 84430194
 Powered by:www.ce.net.cn